Pavan — Development Ninja
NINJA-360
← Ninja-360 Dojo
Pavan Roadmap · Interleaved Phase-2 Plan · V01

Training + Build,
Interleaved Week by Week

Supersedes the "class first, build after" sequencing. Training and the real build now run interleaved, week by week — Pavan learns by shipping, not by finishing a course first.

Prepared 2026-07-16 · V01 · Aligned to the 90-day sprint (W2 = 7/20 kickoff) · Source: Warp Speed SOW/SOP + Partner Pay

01 · Locked Principles

Principle 1

Interleaved, not sequential

Each week = one training module (manual) + one real build deliverable. Learn by doing, not by finishing a course first.

Principle 2

AI modules are earned

Manual competency is the gate — Pavan proves he can do a step by hand before he gets the AI/automation module for it. Research-backed; locked by Tim.

Principle 3

Start the clocks NOW

Two foundation items take real calendar time regardless of effort. They kick off W1 and run in the background so they don't bottleneck the back half of the sprint.

02 · The Two Elapsed-Time Clocks (start W1 — this week)

Both clocks run in the background of every week below. They are not "a week's work" — they are "started W1, watched to completion."

Clock 1 · Deliverability

Email Warm-Up

Stand up mail. + noreply. subdomains with SPF/DKIM/DMARC per the domain strategy, then ramp send volume gradually over ~3–6 weeks to build sender reputation before any real marketing sends.

If we don't start now, the first campaign lands in spam.

Manual competency earned: DNS records + warm-up discipline, by doing it.
Clock 2 · SMS Compliance

A2P 10DLC / Toll-Free Registration

Submit brand + campaign registration — this is the same registration that clears the toll-free SMS block (Error 30032). Approval clock is days-to-weeks.

Dependencies: a live opt-in (the #10 free-audit form) + ToS/Privacy links in the ninja360.net footer.

Manual competency earned: consent + compliance basics.
Both start this week — before Pavan learns to sort footage. Because they cost calendar time, not effort. Skipping this decision costs the September push.
Pavan — engine ninja

03 · Interleaved Week by Week

Aligned to the 90-day sprint · W2 = 7/20 kickoff. Every week: one manual module + one build deliverable. Rows shaded EARNED = AI / automation modules that unlock after manual competency.

Week Manual module (learn by doing) Build deliverable Clocks
W1 · NOW Drive/folder system (Hasan tree) · naming + tagging Scaffold preset folder tree + tag taxonomy START email warm-up + A2P
W2 · 7/20 Invoice submission by hand — owns the invoice engine Acceptance-day invoice checklist live · batch process running warm-up ramping · A2P pending
W3 Run a full capture + sort by hand 2-min shoot-wrap form warm-up · A2P
W4 GHL pipeline basics by hand GHL pipeline stages/config + pre-flight A2P clears ~here → SMS unblocks
W5 Manual edit assembly following Hasan specs Free-audit lead magnet (#10) live = the opt-in A2P needed warm-up completing
W6–W7 Manual color grade + nadir by hand EARNED Extend the Pipeline Builder script → auto-sort (Stage A) deliverability ready
W8–W9 EARNED Auto-color (B) + auto-nadir (C) · data-collection engine
W10–W11 EARNED · LAST Shedit auto-assembly (D — the AI module) · review/audit engine spec
W12–W13 Systems hardening · sign off "done" specs · retro + re-score
Why this order: the automation modules (A→D) only unlock after Pavan has done sort → grade → nadir → assemble by hand. Shedit (the true AI step) is earned last. Meanwhile the two clocks, started W1, finish exactly when they're needed — A2P before prospecting, warm-up before campaigns.

04 · Ties to Comp + Warp Speed

The Pavan Gate — cost in writing, no resale.

Every engine module has its cost documented in writing before it exists, so it can be sold to future clients without renegotiation. Nothing built here gets sold twice at hidden rates. See Cash Rule 5 on Partner Pay.

05 · Immediate Actions — This Week (W1)

  1. Start email warm-up — stand up mail. + noreply. subdomains + auth records; begin volume ramp.
  2. Submit A2P / toll-free registration — needs the opt-in form + footer legal · sequence #10 early if not live.
  3. Confirm the interleaved plan with Pavan at the 7/20 kickoff · set his manual-competency checkpoints for W2–W5.

Ship Weekly. Earn the Automation. Beat the Clocks.

Every week has one thing to learn by hand and one thing to ship. The clocks run in the background. The AI modules unlock as manual competency lands. The sprint ends with Shedit live — because Pavan built it after doing every step by hand first.